+86 180 6807 6594
sales07@puhaosteel.com
+86 180 6807 6594
  • HOME

  • ABOUT US

  • PRODUCTS

    
    • Alloy

      
      • Titanium Alloy

        
        • Titanium Alloy Sheet/Plate

        • Titanium Alloy Coil

        • Titanium Alloy Tube/Pipe

      • Nickel Alloy

        
        • Nickel Alloy Sheet/Plate

        • Nickel Alloy Coil

        • Nickel Alloy Tube/Pipe

      • Monel Alloy

        
        • Monel Alloy Sheet/Plate

        • Monel Alloy Coil

        • Monel Alloy Tube/Pipe

      • Inconel Alloy

        
        • Inconel Alloy Sheet/Plate

        • Inconel Alloy Coil

        • Inconel Alloy Tube/Pipe

      • Hastelloy Alloy

        
        • Hastelloy Alloy Sheet/Plate

        • Hastelloy Alloy Coil

        • Hastelloy Alloy Tube/Pipe

    • Galvanized Steel

      
      • Galvanized Steel Plate/Sheet

      • Galvanized Steel Coil

      • Galvalume Steel Coil

      • Galvanized Steel Strip

      • Galvanized Pipe/Tube

      • Galvanized Steel Wire

      • Barbed Wire

    • Color Coating Steel

      
      • PPGI/PPGL

      • Corrugated sheet

    • Stainless Steel

      
      • Stainless Steel Coil

      • Stainless Steel Plate/Sheet

      • Stainless Steel Pipe/Tube

      • Stainless Steel Bar/Rod

      • Stainless Steel Wire

      • Stainless steel strip

    • Carbon Steel

      
      • Carbon Steel Coil

      • Carbon Steel Plate/Sheet

      • Carbon Steel Pipe/Tube

      • Carbon Steel Bar/Rod

      • Carbon Steel Wire

      • Carbon Steel Rebars

      • Steel Billet

    • Aluminum

      
      • Aluminum Coil

      • Aluminum Plate

      • Aluminum Rod

      • Aluminum Foil

      • Aluminum Profile

    • Profile Steel

      
      • Flat Steel

      • Hexagonal Steel

      • H Steel

      • C Steel

      • Angle Steel

      • I beam

      • steel sheet pile

  • NEWS

  • CONTACT US

  • News

    
    HOME - NEWS

Navigation

  • What are the advantages of your company?

  • Well-equipped production lines and advanced control systems work together to make sure all the stainless steel products we made are in line with the national standards.

  • What changed in ASTM A653 steel certification requirements for North American distributors in 2026

  • Steel mill lead times extended to 14 weeks—here’s how procurement managers are adjusting supply plans

  • Why steel procurement costs rose 12% in Q1 2026—and what distributors can do now

  • The following is the stainless steel production in some regions in 2024

  • Standard characteristics and application fields of 304 stainless steel plate

  • Various Standard and non-standard specifications are both available as customers request.

Contact Us

WhatsApp: +86 180 6807 6594
TEL: +86 180 6807 6594
Email: sales07@puhaosteel.com
  • What are the advantages of your company?
    What are the advantages of your company?
    (1): Prime quality and reasonable price.
    (2): Wide excellent experiences with after-sale service.
    2023/05/26
  • Well-equipped production lines and advanced control systems work together to make sure all the stainless steel products we made are in line with the national standards.
    Well-equipped production lines and advanced control systems work together to make sure all the stainless steel products we made are in line with the national standards.
    Further more advanced automatic width control system (AWC), automatic thickness control system (AGC), bending roll system, work roll channeling roll system and other effective measures are adopted to guarantee product quality.
    2023/05/26
  • What changed in ASTM A653 steel certification requirements for North American distributors in 2026
    What changed in ASTM A653 steel certification requirements for North American distributors in 2026
    For North American steel distributors, ASTM A653 has long been the cornerstone standard for hot-dip zinc-coated (galvanized) and zinc-iron alloy-coated (galvannealed) steel sheets—a specification that dictates product quality, performance, and market access across construction, automotive, manufacturing, and infrastructure sectors. In 2026, ASTM International’s Subcommittee A05.11 on Sheet Specifications rolled out a critical update to the standard, releasing ASTM A653/A653M-25 to replace the 2023 edition (ASTM A653/A653M-23). This revision is not a minor tweak but a set of targeted changes addressing evolving industry needs, environmental regulations, and supply chain vulnerabilities—changes that directly impact how North American distributors source, verify, document, and market ASTM A653-compliant steel. Understanding these updates is critical for distributors to avoid compliance risks, maintain customer trust, and stay competitive in a market already grappling with procurement cost
    2026/03/19
  • Steel mill lead times extended to 14 weeks—here’s how procurement managers are adjusting supply plans
    Steel mill lead times extended to 14 weeks—here’s how procurement managers are adjusting supply plans
    For procurement managers across industries that rely on steel—from construction and automotive to manufacturing and infrastructure—2026 has brought a critical supply chain challenge: steel mill lead times have stretched to 14 weeks, more than double the historical average of 6 to 7 weeks. This dramatic extension has upended traditional supply planning, forcing teams to move beyond reactive problem-solving and adopt proactive, resilient strategies to avoid production delays, cost overruns, and lost opportunities. Unlike short-term bottlenecks driven by seasonal demand, the 14-week lead time reflects deeper, structural pressures in the global steel industry—pressures that require procurement managers to rethink how they source, plan, and collaborate with steel mills and stakeholders.
    2026/03/19
  • Why steel procurement costs rose 12% in Q1 2026—and what distributors can do now
    Why steel procurement costs rose 12% in Q1 2026—and what distributors can do now
    The first quarter of 2026 has brought unexpected pressure to steel distributors worldwide: a 12% year-on-year increase in steel procurement costs. This sharp rise has squeezed profit margins, disrupted supply chain planning, and forced distributors to rethink their operational strategies. Unlike the short-term price fluctuations seen in previous years, this 12% surge is driven by a confluence of structural, geopolitical, and market factors that have reshaped the global steel landscape. To navigate this challenging environment, distributors must first understand the root causes of the cost increase, then adopt targeted measures to mitigate risks and seize potential opportunities.
    2026/03/19
  • The following is the stainless steel production in some regions in 2024
    The following is the stainless steel production in some regions in 2024
    According to data released by the World Stainless Steel Association on July 12, 2024, the global crude stainless steel production in the first quarter of 2024 was 14.585 million tons, a year-on-year increase of 5.5%, and a decrease of 1.3% from the fourth quarter of 2023.
    2025/01/06
  • <Previous
  • 1
  • 2
  • Next>
Wuxi, Jiangsu, China
+86 180 6807 6594
+86 180 6807 6594
sales07@puhaosteel.com


Quick Navigation

  • HOME

  • ABOUT US

  • PRODUCTS

  • NEWS

  • CONTACT US

Product Navigation

  • Alloy

  • Galvanized Steel

  • Color Coating Steel

  • Stainless Steel

  • Carbon Steel

  • Aluminum

  • Profile Steel

Online Message

Submit →
Copyright © Jiangsu Puhao Stainless Steel Co., Ltd.

Privacy Policy



Get real-time quotes

Interested? Leave your contact details. 

SUBMIT


Tel

+86 180 6807 6594


WhatsApp

+86 180 6807 6594


Email

sales07@puhaosteel.com


